more pics as requested
Stage of works
.
The shifter housing has been machined, and re bushed.
The shifter linkages have been modified to suit.
The wiring loom is nearly complete (see pic)
The pedal box has been modified to swap to the RH side
The heater box has been converted
The window wiring, and switches have been converted.
Performax is doing a great job,they keep me well informed on progress and ETA of completeion
yolo