-
here a few pics of my z06 being converted.
Click pictures for a larger shot in a new window
(http://www.splashedpaint.com/cameron/ForumPicsPrompts08/Yolo/fri11039.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/fri11039.jpg)
(http://www.splashedpaint.com/cameron/ForumPicsPrompts08/Yolo/fri11038.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/fri11038.jpg)
(http://www.splashedpaint.com/cameron/ForumPicsPrompts08/Yolo/fri11037.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/fri11037.jpg)
(http://www.splashedpaint.com/cameron/ForumPicsPrompts08/Yolo/fri11035.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/fri11035.jpg)
-
That 3rd pic looks like a plumber's nightmare. I don't think I could bear to watch a conversion on my own car.
-
Great pics Yolo!!!
If you can keep posting the progress pics it would be very interesting to see!!
-
more pics as requested
Stage of works
.
The shifter housing has been machined, and re bushed.
The shifter linkages have been modified to suit.
The wiring loom is nearly complete (see pic)
The pedal box has been modified to swap to the RH side
The heater box has been converted
The window wiring, and switches have been converted.
Performax is doing a great job,they keep me well informed on progress and ETA of completeion
yolo
Click pictures for a larger shot in a new window
(http://www.splashedpaint.com/cameron/ForumPicsPrompts08/Yolo/fri18TH010.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/fri18TH010.jpg)
(http://www.splashedpaint.com/cameron/ForumPicsPrompts08/Yolo/fri18TH009.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/fri18TH009.jpg)
(http://www.splashedpaint.com/cameron/ForumPicsPrompts08/Yolo/fri18TH008.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/fri18TH008.jpg)
-
Interesting how they use a wiring loom drawing on a board as a guide to where the connectors should go...
Thanks for the update Yolo
-
Originally posted by waks
Interesting how they use a wiring loom drawing on a board as a guide to where the connectors should go...
Thanks for the update Yolo
Best way to do it.
And, if you are making a loom from scratch, you partially tack-in nails around the outlines to provide retaining paths for the individual wires.
-
updated pics
Click On Thumbnails To See Larger Pictures
(http://i265.photobucket.com/albums/ii214/yolo300/th_NEWPICS008.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/NEWPICS008.jpg)
(http://i265.photobucket.com/albums/ii214/yolo300/th_NEWPICS006.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/NEWPICS006.jpg)
(http://i265.photobucket.com/albums/ii214/yolo300/th_NEWPICS005.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/NEWPICS005.jpg)
(http://i265.photobucket.com/albums/ii214/yolo300/th_NEWPICS003.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/NEWPICS003.jpg)
(http://i265.photobucket.com/albums/ii214/yolo300/th_NEWPICS002.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/NEWPICS002.jpg)
(http://i265.photobucket.com/albums/ii214/yolo300/th_NEWPICS001.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/NEWPICS001.jpg)
-
Who is doing the work ?
-
Performax (formally corvette queensland)
-
HOW LONG DOES IT TAKE FOR A CONVERSION?
-
also is this being done in brisbane then?
-
It takes 8-10 weeks and is done in Gympie
-
She is finally finished. Special thanks to the staff and management at Performax. Now I have a Two week wait to get the RTA to inspect and rego it.
(http://i265.photobucket.com/albums/ii214/yolo300/th_P3070261.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/P3070261.jpg)
(http://i265.photobucket.com/albums/ii214/yolo300/th_P3070257.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/P3070257.jpg)
(http://i265.photobucket.com/albums/ii214/yolo300/th_DSC_0028-1.jpg) (http://i265.photobucket.com/albums/ii214/yolo300/DSC_0028-1.jpg)
-
Big congrats Yolo. You must be itching to get her out on the road,